Benson High School Medical & Dental Clinic

Omaha Public Schools

A 9,900 square foot, two-story addition with dedicated spaces for three end users. Features a new main entrance for the high school, a first-floor public dental clinic, and a second-floor public medical office. Highlights include a large conference room, interior and exterior gathering stairs, a snowmelt system for exterior paving, and a precast structure with multiple exterior finishes, including EIFS, metal panels, curtain walls, and architectural mesh.

 

Omaha, NE

Roper, Kooserm Fredstrom Early Childhood Additions

Lincoln Public Schools

New additions of early childhood facilities to three existing, occupied elementary schools. Includes classrooms for early learners, teacher planning rooms, storage spaces, restrooms, and corridors connecting to the existing buildings.

 

Lincoln, NE

Hillcrest Elementary School

Brookings School District

New construction of a 96,000 square foot school. Features a new secure entrance with administrative offices, modern classrooms, a gymnasium, media center, early childhood center, and a commons area with a kitchen. Highlights include new surface parking, utilities, surfaced courts, open green space, and outdoor learning areas.

Brookings, SD

Medary Elementary School

Brookings School District

A 91,000 square foot addition with a 14,000 square foot renovation to the existing school. Features new classrooms, learning centers, early childhood education spaces, administrative offices, a commons area, and a gymnasium. Highlights include the transformation of the existing kitchen into a full food prep kitchen, the conversion of the former gymnasium into a commons/cafeteria, and updated site amenities.

Brookings, SD

Battle Creek Elementary & High School

Battle Creek Public Schools

Elementary School: A 14,000 square foot renovation to upgrade classroom finishes in 5th and 6th grade, repurpose locker rooms into staff break and changing rooms, and convert garage/shop area into Special Education classrooms. Features a 1,775 square foot addition with a new main entrance, reception desk, nurse’s office, and administration space.

High School: A 6,000 square foot addition with classrooms, restrooms, welding booths, and a livestock area to promote agricultural growth within the school district. Features an updated track with a durable post-tensioned surface and expanded spaces for field events, including long jump, triple jump, pole vault, discus, and shot put.

Battle Creek, NE

Stuart Public Schools

Stuart Public Schools

Renovation to the existing school for administrative offices and construction of an addition to accommodate a new shop, agricultural classroom, music room, art room, general classrooms.

 

Stuart, NE

Fremont High School

Fremont Public Schools

A multi-phased renovation and expansion of a fully operational high school, featuring a 34,000 square foot Career and Technical Education (CTE) addition with a woodshop, fully-equipped welding lab, automobile area with vehicle lifts, robotics lab, and health sciences section. Interior upgrades include a new secure entrance, expansive weight room, new wrestling room, updated locker rooms, and an improved open auditorium. Infrastructure enhancements include modern HVAC, LED lighting, fire alarms, and intercom systems. Exterior improvements feature a new track, parking lot expansion, six renovated tennis courts, a geothermal well field beneath a new turf football field, and upgraded stadium lighting.

 

Fremont, NE

Beatrice Elementary School

Beatrice Public Schools

A new 146,000 square foot PK-5 elementary school, designed to support seven sections of grades PK-5. Features a two-story building with a full-size gymnasium, art and music rooms, 10 Pre-K classrooms, 36 K-5 classrooms, two innovation centers, and open-concept libraries. Highlights include a spiral slide, a FEMA-rated storm shelter, and a geothermal well field with a water-source heat pump HVAC system.

Beatrice, NE

Christ Lutheran Church and School

Demolition of buildings from 1924 and 1964 to replace with a new band room, gym & locker rooms, kitchen, fellowship hall, and administration area.

 

Norfolk, NE

Rendering provided by Davis Design

Park Middle School

Lincoln Public Schools

This renovation and addition project included removal of the existing HVAC and electrical systems and installation of new systems, as well as updated flooring, paint, new cabinets, markerboards, and ceilings. The cafeteria addition doubles the size of the existing area, and a new soccer field, basketball court, tennis court, and pickleball court were installed.

 

Lincoln, NE

Highland Elementary School

Omaha Public Schools

A renovation and addition project including five new classrooms, administration offices, and a new main entrance. Other features include a new outdoor basketball court, playground, and landscaping updates. New flooring, paint, ceiling, lighting, HVAC, fire alarms, and mechanical/plumbing upgrades throughout the facility were also included.

 

Omaha, NE

Vermillion Elementary School

Vermillion School District

A 117,000 addition of a new elementary school to the existing middle school, with a front office suite to support counseling, nursing, and administration. Features a main competition gym, an auxiliary gym that doubles as a cafeteria and multi-purpose space, a library, and a secure main entrance. Highlights include new classrooms, a media center, a playground, and associated site work.

 

Vermillion, SD

Bennington South Middle School

Bennington Public Schools

As part of an expanded K-8 campus, this 137,900 square foot middle school for Bennington Public Schools features a new track, football field, and practice fields. The structure includes separate classroom areas for each grade, large commons space, media center, two gymnasiums, multiple science classrooms, as well as vocational and general learning spaces.

 

Bennington, NE

Ashland-Greenwood Middle School

Ashland-Greenwood Public Schools

A new 137,000 square foot, two-story middle school with a performing arts auditorium. Features a gymnasium, secure entrance with administrative offices, music rooms, a commercial kitchen, a commons area, and classrooms with flexible learning spaces and science labs. Highlights include a wrestling room, associated site work, and a large auditorium with a professional stage.

 

Ashland, NE

Ashland-Greenwood Elementary School

Ashland-Greenwood Public Schools

New construction of an 84,000 square foot PK-2 elementary school. The building features separate classroom wings for each grade, a commons area, gymnasium, kitchen, media center, administration area with faculty offices, and associated site work including new roads.

 

Ashland, NE

Tekamah-Herman High School

Tekamah-Herman Public Schools

This renovation of a high school includes essential additions and rework to the interior and exterior of the school. The 40,000- square-foot addition includes a new gym, locker rooms, a fitness and weight room, a wrestling practice area, a commons area, state-of-the-art science classrooms, and a new main entrance complete with an administrative area. The project also included renovations to existing classrooms and a new city street that allows easier access to the school facilities.

 

Tekamah, NE

Standing Bear High School

Lincoln Public Schools

Mirroring the new Northwest High School, Standing Bear High School is 244,000 square feet and includes a three-story classroom wing, an innovation hub featuring open concept learning stairs, and state-of-the-art technology throughout. In addition to general classrooms, administrative offices, gymnasiums, and innovation labs, the school will have separate visitor and student entrances on either end.


Lincoln, NE

Northwest High School

Lincoln Public Schools

Mirroring the new Standing Bear High School, Northwest High School is 244,000 square feet and includes a three-story classroom wing, an innovation hub featuring open concept learning stairs, and state-of-the-art technology throughout. In addition to general classrooms, administrative offices, gymnasiums, and innovation labs, the school will have separate visitor and student entrances on either end.

 

Lincoln, NE

Summerland PK-12 School

Summerland Public Schools

Built on a greenfield site, this new 130,000 square foot PK-12 school is the product of over 50 years of partnering, consolidating the Clearwater, Ewing, and Orchard school districts into one building. The state-of-the-art facility includes a top-loading gymnasium, student collaboration areas, STEM spaces with the latest technologies, science labs, media center, commons that overlooks the new athletic field, and a five-room press box on the roof of the building.

 

Ewing, NE 

Kirn Middle School

Council Bluffs Community Schools

Expanding for local middle schoolers, this 115,000 square foot renovation incorporates the new construction of a 13,500 square foot addition. The project features a two-story classroom wing, a new entry/administrative area, a parent drop-off lane, and efficiency improvements to the 40-year-old system.

 

Council Bluffs, IA

Grand Island Memorial Stadium

Grand Island Public Schools

A legacy project to improve the East and West Stadiums, this build increases permanent seating capacity to over 5,000 and creates one of the largest high school stadiums in the state of Nebraska. The project features a two-tier press box with a dedicated filming and media area and includes a coach’s meeting space, updated restrooms, a concession stand, and locker rooms.

 

Grand Island, NE

Laurel-Concord-Coleridge High School

Laurel-Concord-Coleridge Public Schools

A complex demolition, renovation, and new construction project to provide 85,000 square feet of updated school facilities. Features the demolition of a 1922 masonry high school building and other outdated structures, renovation of elementary classrooms, and new construction of high school areas. Highlights include new secure high school entrance with administrative offices, science and vocational classrooms, a relocated fitness facility, and a new storm shelter that doubles as a multi-purpose space.


Laurel, NE

Forest Station Elementary School

Omaha Public Schools

This new 81,000 square foot elementary school features a three-story classroom wing with lower and upper secured entries. It also includes a two-story commons area, gymnasium, cafeteria, library, music room, art room, administration area, faculty offices, and learning stairs. Two playgrounds and an outdoor basketball court round out the new space for pre-kindergarten through fifth grade students.

 

Omaha, NE

Hoehne Vocational Education Building

Hoehne Public Schools

Providing space for STEM-related instruction, this 7,800 square foot new construction of a vocational technical building features open learning spaces for agriculture, welding, and woodworking. The project also includes restrooms, a classroom, an office, storage space, and the renovation of an existing IT room.

 

Hoehne, CO

Leigh Junior/Senior High School

Leigh Community Schools

Integrating the 10,000 square foot remodel of the existing school with the 41,000 square foot addition of a junior/senior high school, this project features specialized classrooms for vo-ag, art, music, family and consumer sciences, fitness, and STEM subjects. Included in the construction is a new gym, locker rooms, and an update to the administrative area.

 

Leigh, NE

Newman Grove Elementary School & Vo-Ag Building

Newman Grove Public Schools

This 6,000 square foot vo-ag building incorporates the relocation of a 15,000 square foot elementary school to consolidate with the existing high school. The project features two new playgrounds, a secure entry, new teacher’s lounge, historical improvements, and the reconfiguration of a land-locked site. It includes the demolition of the existing elementary and the renovation of the existing high school.

 

Hausmann assisted the district with a successful bond vote
Newman Grove, NE

Schuyler Central High School

Schuyler Public Schools

This 32,500 square foot addition to an existing high school features a new gymnasium, cafeteria, and full kitchen. The project includes locker rooms, a wrestling room, and the renovation of the old gymnasium into a theater and banquet area for community use.

 

Schuyler, NE

Adams 12 Five Star Schools – Six Projects

Adams 12 Five Star Schools

This project includes additions and renovations to six separate schools within one school district, all completed within a tight summer timeframe. Coyote Ridge Elementary, Northglenn Middle, Centennial Elementary, and Cherry Drive Elementary feature security upgrades and enhancements; complete new playgrounds and full-size turf fields; gym updates with new floors, bleachers, and lockers; and mechanical, electrical, and plumbing upgrades throughout. STEM Launch and Westlake Middle School feature security upgrades, classroom renovations, complete fire alarm system modernization, new kitchens, gym floors, and main corridor overhauls.

 

Thornton, CO

Highland Elementary

Littleton Public Schools

This 12,200 square foot interior remodel features the conversion of an existing elementary school wing into a new preschool. The project includes new flooring, five preschool-compatible restrooms, a parking lot, and a playground.

 

Littleton, CO

Bryan High School

Omaha Public Schools

Including 10,000 square feet of renovations throughout the existing school, this 19,000 square foot addition features a gymnasium, secure entrance, administration offices, and a 2,500 square foot greenhouse for vocational education.

 

Omaha, NE

Bryan Middle School / Boys & Girls Club

Omaha Public Schools

This interior renovation of an existing middle school features a new secured entrance, new lockers throughout, and the transformation of the main office into a media center. It includes a 15,000 square foot addition with a gymnasium, administration office, outdoor patio, and common areas, home to the new Boys and Girls Club.

 

Omaha, NE

Gering High School

Gering Public Schools

This 110,000 square foot expansion and remodel adds 150 students to overall capacity, accommodating for a new Freshman Academy that features seven new classrooms, three renovated classrooms, and a commons area. The addition incorporates new food service areas, an auxiliary gym, library, and an enlarged auditorium stage. The renovations include multiple computer rooms, a family and consumer science wing, administration spaces, concessions area, staff workroom, lockers, weight room, and bathrooms. A new secure entrance offers improved safety for staff and students.

 

Gering, NE

Messiah Lutheran Elementary School

Messiah Lutheran Church

Creating a two-story Pk-5 educational space, this 35,000 square foot new addition features 13 classrooms, an administrative area with reception, and a secure entrance. The project also includes the renovation and reconfiguration of an existing kitchen.

 

Lincoln, NE

Arapahoe Public Schools

Arapahoe Public Schools

This 91,500 square foot combination of new construction and renovation includes a secure front entry, administration area, commons space, kitchen, new competition gym, locker rooms, and a weight room. The project included the demolition of the 1920s high school, the renovation of the existing elementary into high school classrooms, and redesigning the existing library into an agricultural shop.

 

Arapahoe, NE

O’Neill Junior & Senior High School

O'Neill Public Schools

Providing learning space for both junior and senior high students, this 65,000 square foot addition features a competition gym with locker rooms, secure entrance, training room, administration offices, and twelve classrooms.

 

O’Neill, NE

Columbian Elementary School

Omaha Public Schools

Incorporating a hexagon shape throughout, this new construction of a 67,000 square foot elementary includes a gymnasium, kitchen, and a full-service cafeteria. The new library features a unique learning tree with space to display student artwork.

 

Omaha, NE

Benson High School

Omaha Public Schools

This 150,000 square foot occupied high school renovation features new administrative offices, a culinary classroom, an art classroom with a kiln room, science classrooms, and a nurse’s office.

 

Omaha, NE

Platteview Central Junior High & Platteview High School

Springfield Platteview Community Schools

This demolition and renovation project includes 33,000 square feet of the Junior High building and 7,500 square feet of the High School building. Improvements to the Junior High School feature new classrooms, administrative offices, science rooms with fume hoods, and exterior finishes. The High School project incorporates new locker rooms, new academic lockers, and important electrical and mechanical upgrades throughout.

 

Springfield, NE

Columbus High School

Columbus Public Schools

Providing a new home for Columbus High School students, this new construction of a 257,000 square foot educational facility features two gymnasiums, wrestling and fitness rooms, a music/drama wing, 740-seat auditorium, two-story classroom wing, and an industrial arts shop. The project also includes 875 parking stalls, a new competition field, a track, several practice fields, and event areas.

 

Columbus, NE

Humann Elementary School

Lincoln Public Schools

Adding improved technology throughout the building, this 80,000 square foot interior remodel incorporates an additional 10,000 square feet of new mechanical rooms with a parking lot expansion. It features upgrades to hallways, classrooms, and common areas, including the installation of a new sound enhancement system inside each classroom.

 

Lincoln, NE

Crete High School

Crete Public Schools

This new construction of a 174,000 square foot school features a two-story commons area flanked by a 645-seat auditorium. The project includes an amphitheater, outside patio space, and competition and practice gymnasiums surrounded by a walking track, weight rooms, and wrestling room. The new school is energy efficient with LED lighting, water bottle filling stations, and e-rated glass throughout.

 

Crete, NE

Scottsbluff High School

Scottsbluff Public Schools

This new construction and renovation to a 239,000 square foot high school features updates to all interior flooring and fixtures, locker room remodel, and important security improvements. The project includes a new main entry, new kitchen and cafeteria, freshman classrooms, auxiliary gymnasium, wrestling room, and weight room.

 

Scottsbluff, NE

Crete Middle School

Crete Public Schools

This renovation of an old high school into a middle school features upgrades throughout the building, including a new main entrance and administrative office with lounge. The project incorporated the redesigning of a woodworking shop into an alternate education center and the administrative offices into a media center.

 

Crete, NE

Norris Intermediate School & High School

Norris Public Schools

Meeting the educational needs of over 600 students, this new construction of 67,000 square foot intermediate elementary school features new drop-off and bus lanes, an open cafeteria, multi-purpose room, gymnasium, and special needs areas. The project includes additions and renovations to the existing high school, as well as the renovation of the football field with synthetic field turf.

Hausmann assisted with a successful bond election
Firth, NE

Kloefkorn Elementary School

Lincoln Public Schools

This new 72,000 square foot PK-5 school is designed to incorporate the future needs of the facility. It features a vestibule open to the welcome lobby and a reception area with open views of the playfields. To facilitate after-hours events, a parking lot entrance provides access to the gym and cafeteria/multipurpose area.

Lincoln, NE

West Point Campus Consolidations

West Point Public Schools

This project unifies the K-12 schools of the West Point and Beemer school districts onto one campus. It features a new 65,000 square foot elementary building with a kitchen, cafeteria, media center, and high school competition gym. Also included are extensive renovations to the existing high school facility, incorporating the relocation of the administration offices, construction of new science laboratories, and installation of fire suppression through the facility.

 

West Point, NE