Humann Elementary School

Lincoln Public Schools

Adding improved technology throughout the building, this 80,000 square foot interior remodel incorporates an additional 10,000 square feet of new mechanical rooms with a parking lot expansion. It features upgrades to hallways, classrooms, and common areas, including the installation of a new sound enhancement system inside each classroom.

 

Lincoln, NE

SIMILAR PROJECTS

Park Middle School

Lincoln Public Schools

This renovation and addition project included removal of the existing HVAC and electrical systems and installation of new systems, as well as updated flooring, paint, new cabinets, markerboards, and ceilings. The cafeteria addition doubles the size of the existing area, and a new soccer field, basketball court, tennis court, and pickleball court were installed.

 

Lincoln, NE

Christ Lutheran Church and School

Demolition of buildings from 1924 and 1964 to replace with a new band room, gym & locker rooms, kitchen, fellowship hall, and administration area.

 

Norfolk, NE

Rendering provided by Davis Design

Fremont High School

Fremont Public Schools

A multi-phased renovation and expansion of a fully operational high school, featuring a 34,000 square foot Career and Technical Education (CTE) addition with a woodshop, fully-equipped welding lab, automobile area with vehicle lifts, robotics lab, and health sciences section. Interior upgrades include a new secure entrance, expansive weight room, new wrestling room, updated locker rooms, and an improved open auditorium. Infrastructure enhancements include modern HVAC, LED lighting, fire alarms, and intercom systems. Exterior improvements feature a new track, parking lot expansion, six renovated tennis courts, a geothermal well field beneath a new turf football field, and upgraded stadium lighting.

 

Fremont, NE