Athletic and Recreation Complex

Wayne State College

Renovation and addition project including a 122,252 square foot new athletic and recreation air-supported structure, and 70,650 square foot of recreation space upgrades as well as locker room and office upgrades.

 

Wayne, NE

Rendering provided by RDG Planning and Design

SIMILAR PROJECTS

Center for STEM, Power Mechanics, and Applied Technologies

Community College of Aurora

New construction of a 55,000 square foot educational facility. The building will provide students with hands-on training and education to prepare them for entry into the workforce or transfer to four-year institutions. The curriculum will offer pathways in various fields including construction, diesel power mechanics, engineering, cyber security, renewable energy, as well as other STEM pathways in math, science, and applied technology. The building will be equipped with modern technology and equipment to provide students with the necessary skills and knowledge to excel in their chosen fields.

 

Aurora, CO

Renderings provided by BVH Architecture

Fremont High School

Fremont Public Schools

A multi-phased renovation and expansion of a fully operational high school, featuring a 34,000 square foot Career and Technical Education (CTE) addition with a woodshop, fully-equipped welding lab, automobile area with vehicle lifts, robotics lab, and health sciences section. Interior upgrades include a new secure entrance, expansive weight room, new wrestling room, updated locker rooms, and an improved open auditorium. Infrastructure enhancements include modern HVAC, LED lighting, fire alarms, and intercom systems. Exterior improvements feature a new track, parking lot expansion, six renovated tennis courts, a geothermal well field beneath a new turf football field, and upgraded stadium lighting.

 

Fremont, NE

DSU Beacom Premier Complex

Dakota State University

New construction of a 55,000-square-foot facility that creates a hub for all DSU Athletics. The two-phase project on the 25-acre site creates both an exciting game day and enhanced student-athlete experience. Phase One features site work of a new NCAA competition track, synthetic turf soccer field, and large grandstand, while Phase Two includes a new weight room, locker rooms, E-Sports competition center, hospitality space, and second-level suites overlooking a new synthetic turf football field.

 

Madison, SD