Lincoln Fire & Rescue Station #12

City of Lincoln

New construction of a 13,700 square foot fire station features a four-stall pull-through apparatus bay and an independent decontamination room. The project includes a large kitchen with dining space, ten individual sleeping areas, restrooms, lockers, media/lounge room, workout area, offices, an outdoor patio, and a separate storage area for protective gear, uniforms, and supplies.

 

Lincoln, NE

SIMILAR PROJECTS

YMCA Hastings

YMCA of Hastings

A 90,000 square foot community facility combines extensive renovations with modern additions to create a versatile and inclusive space. The additions feature a 20,800 square foot gymnasium with an elevated running track, a 5,600 square foot child development center, a golf simulator room, an elevator for improved accessibility, and new restroom groups to serve the expanded areas. Renovation highlights include a remodeled and expanded swimming pool, hot tub, and sauna, an updated weight room, an adventure challenge area, dedicated spaces for cardio and aerobics, an updated lobby and offices, revamped locker rooms, and upgraded electrical, mechanical, and plumbing systems to enhance functionality and efficiency throughout the facility.

 

Hastings, NE

Woodbury County Law Enforcement Center

A new 121,000 square foot comprehensive justice and administration complex. Features separate male and female housing units, special needs and psychiatric accommodations, four court rooms, prosecutor and sheriff offices, and intake areas with drive-thru sallyport and heated concrete flooring. Highlights include a FEMA shelter, an on-site Emergency Management Operations and Training Center, and county maintenance facilities, all situated on a 40-acre site with two retention ponds.

Sioux City, IA

Randall Community Water District Regional Waterline

A 72-mile, regional high-capacity water transmission line for Randall Community Water District (RCWD) to carry water from the Missouri River to southeastern South Dakota. The design-build contract was awarded to Hausmann Construction-General Excavating Joint Venture, in collaboration with engineer SEH Inc. Hausmann was also awarded the construction manager at risk contract to complete improvements to the Platte Treatment Plant for RCWD with ID8 Architecture.

South Dakota
Photo courtesy of Randall Community Water District