SIMILAR PROJECTS

Center for STEM, Power Mechanics, and Applied Technologies

Community College of Aurora

New construction of a 55,000 square foot educational facility. The building will provide students with hands-on training and education to prepare them for entry into the workforce or transfer to four-year institutions. The curriculum will offer pathways in various fields including construction, diesel power mechanics, engineering, cyber security, renewable energy, as well as other STEM pathways in math, science, and applied technology. The building will be equipped with modern technology and equipment to provide students with the necessary skills and knowledge to excel in their chosen fields.

 

Aurora, CO

Renderings provided by BVH Architecture

CSU – Chiropteran Research Facility

Colorado State University

New construction of 99,252 sf equine teaching hospital. The JFEH provides leading-edge teaching, research, and clinical services, offering specialized equine veterinary medicine with notable offerings in critical care, isolation, diagnostic imaging, and sports medicine and rehabilitation. The JFEH functions as a full service, tertiary referral equine hospital providing surgical, medical, emergency and elective veterinary treatments for the Rocky Mountain region. It also provides teaching experience for the Professional Veterinary Medicine Program in the College of Veterinary Medicine and Biomedical Sciences (CVMBS), functioning as a center for experiential learning for veterinary students, undergraduate students, and veterinary medical technician students. The facility is a two-story structure with clinical operations and horse stalls on the 1st floor and educational/office components on the 2nd floor.

Renderings provided by Clark & Enersen

Fort Collins, CO

 

Lancaster County Mental Health Crisis Facility

Lancaster County

The Lancaster County Mental Health Crisis Facility underwent a 17,400 square foot addition and renovation. This involved the complete demolition of all existing offices, walls, and MEP systems. New site utilities and a fire suppression wet sprinkler system were installed for safety. The addition featured 19 new bedrooms for patients, along with two seclusion rooms, a fitness area, restrooms, locker rooms, offices, and a parking lot. Significant security enhancements were implemented, including upgrades to doors, walls, ceilings, door hardware, and security systems to meet Behavioral Health guidelines. Unique construction materials were utilized to prevent self-harm incidents within the facility.

 

Lincoln, NE